Gantry Crane for Bridge Construction
Gantry Crane for Bridge Construction
Gantry Crane for Bridge Construction
Gantry Crane for Bridge Construction
Gantry Crane for Bridge Construction
Gantry Crane for Bridge Construction
Gantry Crane for Bridge Construction
Gantry Crane for Bridge Construction

Gantry Crane for Bridge Construction

900T Bridge Construction Gantry Cranes is a new type of high-speed railway bridge erection machine developed by Sinoko cranes for the multi-tunnel project encountered in the construction of high-speed railway. Main features as following:


(1) Suitable outdoor dusty environments

(2) Heavy capacity

(3) Huge construction projects

(4) Long life span and multiple times appliation

Share With:


Gantry Crane for Bridge Construction

Overview:

bridge construction gantry cranes


Sinoko crane is focusing on the development of bridge erection machine for many years. Bridges and tunnels can be set up to connect and work, reducing the cost of multiple disassembly and assembly and improving construction efficiency. The lifting system adopts four-point fixed lift beam, which is balanced by load to ensure the safety of the concrete box girder and the lifting system's own structure. Through the vertical and horizontal fine adjustment of the lifting mechanism, the accuracy of box girder erection can be achieved


Features

1. Bridges and tunnels can be set up to connect and work, reducing the cost of multiple disassembly and assembly and improving construction efficiency.

2. The lifting system adopts four-point fixed lift beam, which is balanced by load to ensure the safety of the concrete box girder and the lifting system's own structure. Through the vertical and horizontal fine adjustment of the lifting mechanism, the accuracy of box girder erection can be achieved.

3. Guiding beam and bridge erector guide each other and move through the hole vertically. The operation is simple, safe and reliable.

4. It can realize variable-span erection and can realize the erection of curve sections. The tire-type beam-carrying trolley can directly transport the overall structure of the beam-beaming machine to realize the erection of the bridge-transporting machine, crossing the tunnel and positioning the tunnel entrance.

5. Through the guide girder and the guide girder to lift the trolley and the auxiliary crane, the erection of the bridge head, the end hole beam and the tunnel entrance and exit beams can be realized.

Specification

ModelTHQ900
Max.capacity900
Maximum size of Erection beam(m)32.6×12.6×3.05
Bridge machine walking speed(m/min)2000/3/1
Lifting trolley traveling speed(m/min)0-3(Heavy capacity)/0-6(Non-loading)
Lifting trolley hoisting speed(m/min)0-0.5(Heavy capacity)/0-1(Non-loading)
Maxmum height of trolley hoisting(m)7
Beam lateral fine-tuning distance(mm)±200
Beam tuning speed(m/min)2000/1/1
Set the minimum radius of the curve bridge(m)1500
Adapt to slopeLongitudinal slope 20%o Crossing slope 40%
Installed capacity(kw)300
Outer dimensions(m)61×15.3×14.6
Total weight(t)585



Get a Free Quote

CASE

Discover how the 900T Bridge Construction Gantry Crane transformed a major bridge project. By handling massive loads with precision, this crane improved safety, reduced construction time, and boosted overall efficiency. Explore the case study to learn more about its impact.

40.5T Rail-Mounted Gantry Crane Installation for Port Logistics Efficiency

40.5T Rail-Mounted Gantry Crane Installation for Port Logistics Efficiency

The RMG gantry crane designed and manufactured by Sinokocrane has effectively solved the problems for the customers and reduced their operational costs.

Learn More Get a Quote
5T Portable Gantry Crane Deployment for Australian Equipment Rental

5T Portable Gantry Crane Deployment for Australian Equipment Rental

The portable gantry cranes provided by Sinoko Cranes for the leasing company of Australian customers have significantly increased the number of rentals for the customers and enhanced the revenue of their companies.

Learn More Get a Quote
Installation of 10T European-Style Gantry Crane for Pakistani Client by Sinoko Cranes

Installation of 10T European-Style Gantry Crane for Pakistani Client by Sinoko Cranes

Struggling with slow manual gates? Sinoko's European gantry crane slashed Pakistan customer's downtime by 64%! Transform your access efficiency – contact us!

Learn More Get a Quote

FAQs

1. What is a 900T Bridge Construction Gantry Crane?

A 900T Bridge Construction Gantry Crane is a heavy-duty crane designed specifically for lifting and transporting large bridge components during construction projects. It can lift up to 900 tons and is ideal for use in bridge building and heavy infrastructure work.

2. What types of projects can benefit from a 900T Bridge Construction Gantry Crane?

This crane is perfect for large-scale bridge construction, infrastructure projects, and lifting heavy segments of bridges, tunnels, or other major civil engineering works that require precision and heavy lifting capacity.

3. What is the lifting capacity of the 900T Bridge Construction Gantry Crane?

As the name suggests, the 900T Bridge Construction Gantry Crane has a maximum lifting capacity of 900 tons, making it suitable for the most demanding bridge construction and infrastructure lifting tasks.

4. How does the 900T Gantry Crane improve construction efficiency?

The crane’s powerful lifting capacity, coupled with precise movement, enables faster and safer lifting and positioning of heavy bridge components, which significantly speeds up the construction process and reduces delays.

5. What safety features does the 900T Gantry Crane include?

This crane is equipped with advanced safety systems such as overload protection, anti-collision sensors, emergency stop functions, and automatic load monitoring to ensure safe and efficient operation on complex construction sites.

6. Does Sinoko provide installation and operator training for the 900T Gantry Crane?

Yes, Sinoko offers full installation services and comprehensive operator training to ensure the safe and optimal use of the 900T Bridge Construction Gantry Crane on your project site.


    Get In Touch

    Our teams are on hand to provide you with the right lifting solutions.

    FEW TIPS

    1.Load capacity: ton?

    2.Span of the crane: m?

    3.Max. lifting height of the crane: m?

    4.What materials will be handled: ?

    5.How many hours will the crane work per day: ?

    6.Traveling distance of the crane: m?